Chinese New Year 2027 falls on 6 February 2027, and the Lantern Festival on 20 February 2027 marks the end of the holiday season. Toy factories in Chenghai slow down before the holiday and close for several weeks around it. A new custom toy order should be confirmed up to about 74 days before the factory’s last production date, to fit samples, artwork, testing and 25–45 days of production.
Chinese New Year is the main family holiday in China, and much of the workforce in Chenghai’s toy factories travels home for it, often to other provinces. Production does not stop on a single day, and it does not restart on a single day either.
For toy orders, the Chinese New Year factory shutdown is therefore longer than the public holiday itself. Each factory sets its own last production day and reopening day, so there is no single Chinese New Year 2027 factory closure date for the whole district. For each order, the last production date is confirmed with the factory when you confirm the order, and your timeline should work back from that date.
Start with the date the factory confirms as its last production day for your order. Then subtract each step that still has to happen before production can start. The times below are the typical figures quoted for Chenghai toy orders.
Toy order steps before Chinese New Year
| Step | Typical time |
|---|---|
| Quote with FOB price, carton data, CBM, MOQ and lead time | Within 1 business day |
| Ex-stock samples by courier | 3–7 days |
| Artwork sign-off for private label or OEM packaging | About 1 week |
| Third-party testing, if the item has no valid report | 7–14 days |
| Production (battery-operated and RC) | 25–40 days |
| Production (educational, STEM and DIY) | 25–40 days |
| Production (summer and inflatables) | 25–35 days |
| Production (general range) | 25–45 days |
| Sea freight after loading | About 15–20 days to US West Coast; about 30–35 days to US East Coast |
Add up only the steps that apply to your order:
Treat the result as the latest safe date, not the target. Lines that are already full ahead of the holiday cannot add capacity, so confirming early gives the factory room to schedule your order without rushing it. Factories generally schedule production once the deposit is received, so pay the 30% deposit as soon as the order is confirmed, and plan the 70% balance, which is due before shipment.
Standard catalogue items. Items on running production lines ship much faster than new runs: in our catalogue, 90% of standard items list a lead time of 10 days or less (see toy carton and container data 2026). They avoid the queue after the holiday. Availability is confirmed per item on the quote.
Split the order. Put the items that are ready, with approved samples and valid reports, into the pre-holiday run. Leave new designs and custom packaging for the first production after the restart.
Use the holiday for paperwork. Finish artwork, labelling text and order details so production can start as soon as the line reopens, rather than after it reopens and then waits for your files.
Ship a smaller first load. LCL works for trial orders, and a 20ft container across 3–4 categories is a practical entry point. A mixed 20ft container can carry 200+ SKUs, so a partial range can still go out before the break. See mixed container toys wholesale.
Chinese New Year sits between two busy periods. From August to October, Chenghai lines fill for Christmas, and the same SKU that quotes 25 days in March can quote 40+ days in September. Christmas orders confirmed by late June ship comfortably; see the Christmas order deadline. Orders for spring, Easter and summer ranges cross the holiday, so the time lost around it has to be built into those plans. Summer and inflatable lines need 25–35 days of production plus transit, which means they should be confirmed before the break rather than after it. See summer toys wholesale and the full wholesale toy buying calendar.
If you are choosing new items now, the 25th Shantou · Chenghai International Toys and Gifts Fair runs from 29 October to 1 November 2026 at the Shantou International Convention and Exhibition Center. LeTin Toys’ office and showroom in Chenghai is about 40 minutes by car from Shantou Jieyang Airport, and factory visits can be arranged with a few days’ notice. More in the Chenghai toy market guide.
Want to confirm an order before the break? Send your list for a quote in 1 business day, or WhatsApp +86 137 2926 5640.
Chinese New Year falls on 6 February 2027, and the Lantern Festival, which marks the end of the holiday season, falls on 20 February 2027. Toy factories slow down in the weeks before and restart gradually after.
Factories close for several weeks around the holiday, and each factory sets its own dates. The last production date for your order is confirmed with the factory when the order is confirmed.
Count back from the last production date. A new item with custom packaging and no test report can need up to about 74 days; a repeat order with no changes needs only the 25–45 days of production.
They are scheduled after factories reopen, in line behind orders interrupted by the break. Finishing artwork and approvals during the holiday lets production start as soon as the line restarts.
Standard catalogue items are the main option, with availability confirmed per item. You can also split the order, shipping ready items before the break and new designs after it.